NAVAL FACILITIES ENGINEERING COMMAND
Pre-Construction Plan Books for the Navy
The small investment you make here with PreConstructionPlans.com will save you money and give you a partner to work with that guarantees your plans will be approved and you can get started as quickly as possible!
The NAVFAC is comprised of multiple regions. One region to the next may have slightly different plan formatting requirements. It is typically the case that any of the plans offered through PreConstructionPlans.com will contain all of the information required to substantially meet contract requirements.
In an effort to reduce confusion and make the review process simple for you government reviewer, we have prepared multiple formats to directly address specific formats called out in multiple project specifications issued by the NAVFAC. It is the goal of preconstruction plans to provide plans that are formatted as closely as possible to different project specifications currently being issued by NAVFAC regions serving multiple geographic and technical areas throughout the U.S and abroad.
Plans Specific to NAVFAC
We suggest you look at the specific requirements in your project specification and compare it to the table of contents in the samples we offer. Typically, you can find your CQC Plan Requirements in Specification Choose the plan that most closely mirrors your specification requirements. This will speed the government review process and reduce any potential for confusion or comments during the government review.
If you are working from an RFP or project specifications that do not specifically call out the requirements, we recommend that you select NAVFAC CQC Plan 1, EMP Plan 1, and APP (2014). These templates contains the typical NAVFAC plan requirements without volunteering too much additional information that may slow the plan review process.
If your Specs require a plans format that does not match the format presented below, please contact us and we will prepare a plans template that matches your specification exactly and provide it to you within 24-48 hours at the same price as the listed price for the plan required.
Please Contact us at 206.734.4600 with any questions.
MASTER TABLE - NAVFAC Plans
Determining Which Version of Plans to Download
Below are the Master Tables of content for the NAVFAC plans currently offered through www.PreconstructionPlans.com. Each individual section also has their own table of contents with substantially more details concerning the content of each section. Please download free samples if you would like examples of Section TOCs (Tables of Contents).
Accident Prevention Plan Templates
Quick Reference Table of Contents for NAVFAC APP Options
The NAVFAC APP is the most voluminous of the required plans. The Master Table of contents for the 2008 and 2014 versions of the APP are identical. However, the content is substantially different. Please refer to your specifications to determine which template version (2008 or 2014) is appropriate.
As of June 2015 the 2014 version of USACE Safety Manual E.M. 385-1-1 has not been published in hard copy but the electronic version is available online. Many USACE and NAVFAC Contracting Officers are now requiring the project Accident Prevention Plan (APP) to be prepared under the requirements of the 2014 version even if Contract issued Specification references the 2008 version of E.M. 385. Some contracts however still require project plans to be prepared in accordance with the 2008 version of E.M. 385.
We recommend you confirm with your COR which version is applicable to your project. If you would like help determining this, please call us or email your specs to us. Jenn@PlanTheJob.com | (206) 734-4600.
MASTER TABLE OF CONTENTS
Acronyms and Abbreviations
Section 1 Signature Sheet
Section 2 Background Information
Section 3 Statement of Safety and Health Policy
Section 4 Project Organization
Section 5 Subcontractors and Suppliers
Section 6 Training
Section 7 Safety and Health Inspections
Section 8 Accident Reporting
Section 9 Required Plans
Section 10 Risk Management Processes
Appendix I Personnel Qualifications
Appendix II Material Safety Data Sheets
Quality Control Plans Templates
Quick Reference Table of Contents for NAVFAC QC Plans Options
Quality Control Plan Templates, 3 Version are available:
1. CQC Plan 1 - Build-Construction (Approx. 55 pgs)
2. CQC Plan 2 - Design-Build Complete (Approx. 73 pgs)
3. DQC Plan - Design Quality Control Plan (Approx. 46 pgs)
CQC Plan 1: Build - Construction
MASTER TABLE OF CONTENTS
Acronyms and Abbreviations
Section A Quality Control Organization
Section B Project Staff Qualifications
Section C Appointment Letters
Section D Submittal Procedure
Section E Testing Procedures
Section F Procedures for Performing the Three Phases of Quality Control
Section G Procedures for Tracking Construction Deficiencies
Section H Reporting Procedures
Section I Definable Features of Work
(CQC PLAN 1: 55 Page Template, in addition to Submittal Log Template & Test & Plan Log.)
CQC Plan 2: Design - Build - Complete
MASTER TABLE OF CONTENTS
CQC Plan Cross-Reference Table
Acronyms and Abbreviations
Section A Quality Control Organization
Section B Project Staff Qualifications
Section C Duties & Responsibilities
Section D Appointment Letters
Section E Definable Features of Work
Section F Submittal Procedures
Section G Testing Procedures
Section H Deficiencies
Section I Three Phases of Quality Control
Section J Documentation
Section K Completion Inspection Procedures
Section L Training and Certification Logs
(CQC PLAN 2: 73 Page Template, in addition to Submittal Log Template & Test & Plan Log.)
DQC Plan: Design Quality Control Plan
MASTER TABLE OF CONTENTS
Acronyms and Abbreviations
Section 1 Introduction
Section 2 Design Quality Control Organization
Section 3 Authorities and Responsibilities
Section 4 Resumes and Qualifications
Section 5 Letters of Delegation
Section 6 Design Schedule and Packaging
Section 7 Communication Plan
Section 8 Subcontractors and Scope
(DQC Plan: Design Quality Control Plan: 46 page template)
Environmental Plans Templates
Quick Reference Table of Contents for NAVFAC Environmental Plans Options
Environmental Plan Templates, 3 Version are available:
1. EMP 1 (Approx. 82 pgs)
2. EMP 2 (Approx. 88 pgs)
3. EPP (Approx. 42 pgs)
Environmental Management Plan 1 (EMP 1)
MASTER TABLE OF CONTENTS
Acronyms and Abbreviations
Section 1 Introduction
Section 2 Appointment Letters
Section 3 Management of Natural Resources
Section 4 Protection of Historical and Archeological Resources
Section 5 Storm Water Management and Control
Section 6 Prevention of Releases to the Environment
Section 7 Protection of the Environment from Waste Derived From Contractor Operations
Attachment A ECATTS Certificates
Attachment B RESUMES AND QUALIFICATIONS
(NAVFAC EMP 1: 82 page template)
Environmental Management Plan 2 (EMP 2)
MASTER TABLE OF CONTENTS
Acronyms and Abbreviations
Section 1 Introduction
Section 2 Appointment Letters
Section 3 Management of Natural Resources
Section 4 Erosion & Sediment Control Plan
Section 5 Waste Water Management
Section 6 Non-Hazardous Waste / Construction and Demolition Waste Management
Section 7 Hazardous Waste Management
Section 8 Prevention of Releases to the Environment
Section 9 Protection of Ambient Conditions
Attachment A ECATTS Certificates
Attachment B RESUMES AND QUALIFICATIONS
(NAVFAC EMP 2: 88 Page Template)
Environmental Protection Plan Template (NAVFAC EPP)
MASTER TABLE OF CONTENTS
Acronyms and Abbreviations
Section 1 Introduction
Section 2 Appointment Letters
Section 3 Management of Natural Resources
Section 4 Protection of Historical and Archeological Resources
Section 5 Storm Water Management and Control
Section 6 Prevention of Releases to the Environment
Section 7 Protection of the Environment from Waste Derived From Contractor Operations
Attachment A ECATTS Certificates
Attachment B RESUMES AND QUALIFICATIONS
(NAVFAC EPP: 42 Page Template)
NOTE: The NAVFAC EPP seems to be the plan that is most evolving. Until recently, The NAVFAC used one of the EMP formats but recently (2015) they have started using new EPP formats.
If your Specs require a NAVFAC EPP and the format does not resemble the format presented here, please contact us and we will prepare an EPP template that matches your specification exactly and provide it to you within 24-48 hours at the same price as the listed price for the EPP. This offer is valid for any of the plans templates offered through www.PreConstructionPlans.com.
Please Contact us at 206.734.4600 with any questions. Email: Info [at] PlanTheJob.com